Load all affected time series states in selection list |
Scroll
![]() |
You can transfer all affected base production time series of a transaction into the time series selection window on the right at the same time.
▪To do this, click on the desired transaction.
▪To do this, open the context menu in the left-hand window and select the Load all affected time series in drop-down list box entry. The following dialog appears:
Here you can overwrite (Yes) or extend (No) the existing time series selection. If you can apply the time range of the transaction to the time selection, select this in the dialog that opens.
The time series are transferred to the time series selection window.