Edit time series: Transactions in the time series browser of the data collection center DMO |
Scroll
![]() |
In AquisNet DMO, you can manually validate time series using the graph and table interfaces. To ensure data consistency, this is only allowed for base production time series. Dependent time series affected by the change are automatically recalculated by the system. AquisNet stores the change history resulting from manual validations in transactions.
If time series values or error codes have been changed, the system asks the user via a control message when exiting the view whether the changes should be saved. If a time series contains at least one changed value or changed error code, AquisNet asks the user for a transaction name and a textual description (comment) of the transaction. Only after the user has entered the information AquisNet saves the before and after status in the transaction so that it is available for later displays or even rollbacks.
Note:
▪Changes are only possible in a base production time series. The base production time series and thus also the time series derived from them always contain the latest and thus best quality information.
▪Automatic changes by the import validation or plausibility checker are displayed in the change bar. However, no time series with pre-change information are generated.
You find detailed information on this in the following chapters: